//data.zz.baidu.com/urls?site=www.whjygj.cn&token=vCR0fAjiWe30M6Ky

上海高端私人预约

 News

News Center

Current location: home page > News Center > Industry information

What should be paid attention to during the transportation and installation of VIKING gear pump?

2023-06-02 17:31:49
second

VIKING gear pump It is a commonly used industrial pump, which has a wide range of applications, such as petroleum, chemistry, medicine, food and other industries. As an important industrial equipment, its transportation and installation should pay attention to the following aspects.

1、 Transportation

At VIKING Gear pump During transportation, try to avoid vibration, collision and inclination, so as not to affect the performance and life of the gear pump, but also increase the installation difficulty and maintenance cost.

1. Select the appropriate transportation means

When transporting VIKING gear pump, proper transportation tools must be selected to ensure that the pump is intact. Generally speaking, small gear pumps can be transported by cars or minivans. For larger gear pumps, special transport vehicles, such as flatbed trucks, should be selected to ensure safety and clarity.

2. Packaging and fixation

During transportation, VIKING gear pump should be properly packed and fixed. The external package of the pump shall fully protect the gear pump to prevent the surface of the pump body from damage and collision of parts. During fixation, the support shall be firm and properly fixed with hemp rope, rope, etc., and the height shall not exceed 3m. ASL electrostatic oil filter

3. Proper handling

When handling the VIKING gear pump, attention should be paid to avoid accidents such as interference, collision and falling of objects. When necessary, special tools and equipment for handling should be used, and operators should ensure their own safety.

2、 Installation

The installation of gear pump is an important link to ensure its normal operation and use effect. When installing the gear pump, pay attention to the following aspects.

1. Preparation before installation

Before installation, the gear pump shall be cleaned and checked for surface defects, scaling, foreign matters, etc. It is also necessary to clean the discharge pipeline of relevant equipment, and prepare the required tools and materials according to the actual situation and equipment requirements.

2. Installation position

The installation of VIKING gear pump should be carried out on the corresponding fixed foundation and support. The installation position should take into account the ventilation and heat dissipation, maintenance, inspection convenience and other factors of the pump. IDEX

3. Discharge pipe connection

When connecting the corresponding discharge pipeline, it is necessary to ensure that the specification of the pipeline corresponds to the pump port, and ensure that the pipeline is connected, without air leakage, liquid leakage or oil leakage. Special sealing materials need to be used, such as gaskets, wire gaskets, rubber rings, etc.

4. Installation of pump body and drive device

Before installing the pump body, it is necessary to install the pump wheel and adjust the fit clearance and alignment of the pump wheel. After the pump wheel is installed, the pump body shall be installed and threaded according to the torque required by the specification. During installation, the weight of the pump body is large, and attention should be paid to the safety of operators.

5. Lubrication and refueling

In order to ensure the running effect of the gear pump, it is necessary to lubricate or add oil for the first time after installation. The lubrication or oiling position depends on the actual situation, and generally needs to be operated according to the instructions.

To sum up, the transportation and installation of VIKING gear pump need to pay attention to many issues, such as the selection of appropriate transportation means, proper packaging and fixation, avoiding collision and swing, as well as the installation position, discharge pipe connection, pump body and drive device installation, etc. Only by dealing with these problems, can we ensure the normal operation of the gear pump and extend its service life.


Recent browsing:

Related products

24-hour hotline

Tel.: 027-87775190

Tel.: 027-87775190 87775191 87775192

Address: B1216, Optics Valley International Building, 2-2 Guandongyuan Road, Hongshan District, Wuhan

Scan and contact us

Follow us for more highlights