//data.zz.baidu.com/urls?site=www.whjygj.cn&token=vCR0fAjiWe30M6Ky

上海高端私人预约

 News

News Center

Current location: home page > News Center > Technical Information

Users with experience in the application of three screw pumps need to read this article.

2023-01-25 14:32:58
second

Sweden IMO screw pump Precautions for application (I)

The whole series of IMO Three screw pump The product does not require special skills when starting, but it lacks three Screw pump Users who use experience need to read this article.

1、 Correct installation is the condition to ensure safe and stable operation.

Ensure that the inlet and outlet pipelines do not have too much stress on the pump body, and the pipeline shall be completely purged before the device to prevent welding slag and other sundries from entering the pump, and so on. It is unnecessary to repeat these basic knowledge here. The following points illustrate the contents of the pump.

The selection of couplings and bell housings shall ensure that the products with qualified quality are selected to ensure that the concentricity meets the requirements. Poor quality products may cause early damage to pump bearings and mechanical seals. This condition can be easily identified according to the abnormal noise and oscillation that may occur when the pump is running. This point focuses on the gap between the two coupling halves. Please refer to the following table for details. Too small clearance may lead to irreversible results such as premature damage of pump bearings, screw seizure in severe cases, etc.

Coupling clearance reference value

2、 Layout of suction inlet pipeline and selection of pipe diameter

The suction pipeline needs to be planned and the reasonable pipe diameter confirmed by a professional process engineer. To ensure that the necessary NPSHr of the pump is less than the available NPSHa of the system, and there is a sufficient margin. In this way, cavitation will not occur when the pump is running. The inlet pipeline shall be as short as possible and the elbows and valves shall be as few as possible to reduce the loss of pressure head. The flow rate in the pipe shall be between 0.5-1.2m/s, and the oil injection port shall be reserved on the pipe for refueling before starting.

Suction line layout


Recent browsing:

Related products

Related news

24-hour hotline

Tel.: 027-87775190

Tel.: 027-87775190 87775191 87775192

Address: B1216, Optics Valley International Building, 2-2 Guandongyuan Road, Hongshan District, Wuhan

Scan and contact us

Follow us for more highlights