ALLWEILER screw pump It is a commonly used industrial pump, and its installation and commissioning are very important for normal operation and extended service life. The following will describe in detail ALL WEILER Screw pump Correct installation and commissioning methods and installation points.
The first is the preparation before installation of ALLWEILER screw pump. Before installation, first confirm the installation position and direction. The installation position of the pump shall be horizontal as far as possible and convenient for repair and maintenance. At the same time, the direction of the pump shall be consistent with the direction of the pipeline. In addition, before installation, check whether the transportation package of the pump is intact, and whether the pump body and rotating parts are obviously damaged.
Next is the specific installation steps. First, place the pump at the predetermined position, and use a level gauge to calibrate the levelness to ensure the horizontal installation of the pump. Then, use bolts to fix the pump on the foundation to ensure the stability of the pump. Before fixing the bolts, check the flatness and strength of the foundation, COLFAX agent Ensure that it can bear the weight and vibration of the pump. Next, connect various inlet and outlet pipes according to the requirements of pipe connection, and pay attention to the tightness and leak proof of pipe connection. After the installation of pipes, check whether the pipes and valves are opened and closed normally.
After installation, the next step is debugging. First, check the fastening of all interfaces to ensure that there is no looseness. Then, according to the use medium of the pump, select the appropriate shaft seal and packing, and correctly install them on the pump. At the same time, for the lubrication part, add lubricating oil and clean lubricating points. In addition, check whether the axial clearance and radial clearance of the pump meet the requirements. Finally, by starting the trial run pump, observe the operation of the pump, adjust the flow and pressure and other parameters to ensure the normal operation of the pump. CIRCOR SECCO
When installing and debugging ALLWEILER screw pump, the following points should be noted:
The installation position of the pump shall be reasonable to ensure the horizontal installation and stable fixation of the pump, so as to prevent vibration and noise during the operation of the pump.
Ensure that the pipeline connection is tight and leak proof to avoid water or oil leakage during the operation of the pump.
The shaft seal and packing of the pump shall be properly selected and correctly installed to ensure the sealing performance and service life of the pump.
Regularly check the axial clearance and radial clearance of the pump, and timely adjust and replace the worn parts to ensure the stable operation of the pump. Viking
During commissioning, carefully observe the operation of the pump, pay attention to adjusting parameters such as flow and pressure, and avoid pump failure or greater energy consumption caused by too large or too small.
Through correct installation and commissioning, ALLWEILER screw pump can operate normally, improve work efficiency and extend service life. I hope the above content is helpful to you.