IMO screw pump Fundamental maintenance of
1. If the sound of the pump and motor is abnormal (or the pointer of the ammeter rises rapidly), stop the pump immediately to find out the cause.
2. The outlet pressure shall not exceed the pressure indicated on the pump nameplate.
3. The safety valve has been adjusted before production and cannot be adjusted at will.
4. The pipeline system has problems. If there is a safe return flow, stop the machine immediately to eliminate the problems. The return time of general safety valve shall not exceed three minutes. If the time is too long, Screw pump The continuous pulse wave of the internal reflux liquid will cause the screw pump to oscillate, and even cause the pump to "jam" and damage.
5. Leakage of shaft seal is normal. If the oil leakage is greater than 10ml/h, shut down the machine for troubleshooting or replace with a new seal.
6. Overload maintenance elements shall be provided in the circuit for controlling motor operation. If the water pump "bites", the power supply should be cut off actively to prevent the motor from burning.
G type screw pump Screw pump start
1. Before starting the G type screw pump, check the tightness of all pipeline flanges and joints, and ensure they are tight.
2. Roll the coupling to check whether the pump rolls sensitively. If there are other undesirable phenomena, such as being stuck by another force, remove the G type screw pump.
3. When starting for the first time, unscrew the safety valve filler plug or remove the cover plate, inject liquid into the pump, and roll the coupling counterclockwise by hand to ensure that all friction pairs are fully smooth.
4. Before starting, all valves in the suction and discharge pipelines shall be opened, and it is strictly prohibited to close the valves for starting. Check whether the motor rolls normally.
5. After the above preparations are completed, the power can be connected and the engine can be started directly.